Fussgängerlehnensteg 8 **
Erlenbach (ZH)
Construction type | Open Bridge |
---|---|
Construction shape | Iron Carrier |
Obstacle | Dorfbach (Running waters) |
Coordinates | 687960 / 239960 |
Altitude | 490m |
Max. load | 0.5t |
Length | 11.0m |
Usable width | 1.0m |
In charge | Gemeinde Erlenbach |
Deck coatings | Roundwood piles |
Facade coating | Handrails in timber |
Restrictions | General ban |
ID | 1408 |
Remark [de]
Gesandt von Ernst Spiess
Bridge visited or documented in 2011