Fussgängerbrücke **
Sonlert (TI)
Construction type | Open Bridge |
---|---|
Construction shape | Truss |
Obstacle | Bavona (Running waters) |
Coordinates | 684787 / 138597 |
Altitude | 778m |
Built | 2009 |
Max. load | 0.5t |
In charge | Gemeinde Sonlert |
Access | Pedestrian |
Supports | Stone pillar |
Deck coatings | Planks across |
Facade coating | Handrails in timber |
Restrictions | General ban |
ID | 175 |
Bridge visited or documented in 2009